Completed Projects in India

Unity Infraprojects Limited, Mumbai/Maharashtra/India




General Manager Description of the works

1. Construction of Yatri Niwas Building of TSSHS, Nanded including Electrical, Plumbing and Fire Fighting work
2. Construction of Guru Granth Sahib Bhawan (GGSB) & Auditorium of TSSHS, Nanded including Electrical, Plumbing and Fire Fighting work
3. Construction of Chauhan Hyundai Car Showroom, Nanded, Maharashtra Main duties performed

Completion of the projects in time frame, coordinating with consultant, client, sub contractors, vendors, head office, our staff etc.

Planning and schedule for complete project, from start to completion
Preparation and submission of program to client Finalization of item rates for subcontractors consulting with HO
To allot the works to different persons location wise
Supervision, leadership and co ordination with own staff
Periodical review meetings to review the progress of work
Control of project cost wise
Co ordination with consultants, designer and client
Daily site visits to see the progress of work and if there is any difficulty, then to give the solution for that
Periodical checking for quality control tests
Periodical meetings with subcontractors to know there difficulties and try to give the solutions
Review for material requirement for daily use with store manager
To give directions to our billing engineers to prepare the bills of subcontractors time to time and sending these bills to HO for there approval and payment
To give directions to our billing engineers to prepare the monthly bills to submit to the client time to time for there approval and payment
Reconciliation of material on monthly basis and take necessary steps for shortfall/wastage of material

June / 2007 - September / 2009

Unity Infraprojects Limited, Mumbai/Maharashtra




General Manager (Projects) Expansion and Modification of Mumbai Airport Terminal- 1B (Domestic), including Air Conditioning, CCTV Surveillance, Electrical work, Plumbing work and Fire Fighting
Executed following works
80 Check-in counters
Canopy above check-in counters
Pillar less check-in area
Kalzip roofing
VIP Lounge
Mezzanine Cafeteria
Skylight domes
Baggage makeup area
Baggage arrivals and claim area
Conveyor belts
Departure and arrival areas
Transit passenger area
ACP cladding
Landscaped gardens
Car Parking
Air conditioning
Plumbing work

Main duties performed in this project are listed below

Planning and scheduling for complete project, from start to completion
Periodical review meetings to review the progress of work
Control of project costs
Coordination with consultants, designer and client
To arrange periodical meetings with higher authorities to review the progress of work and to discuss difficulty/bottlenecks in the progress of the project
To give suggestions for the speedy completion of the project to client and also submission of the report of financial implication due to the changes suggested
To carry out office correspondence with the client and HO, and to maintain the records
Periodical meetings with subcontractors to know there difficulties and try to give the solutions
Reconciliation of material on monthly basis and take necessary steps for shortfall/wastage of material

December / 2005 - May / 2007

Unity Infraprojects Limited, Mumbai/Maharashtra 




Project Manager (Execution) Construction of Tansa Masonry Dam Strengthening Works comprising construction of 68 Buttresses in Colgrout Masonry and strengthening of spillway Allied works include construction of Submersible Bridge on d/s of dam, Improvement to the Atgaon-Tansa Road: 13 Km. length and construction of Cat Walk Steel Bridge, Mumbai, Maharashtra
Major works of the project
Excavation by controlled blasting and chiselling
Apron concrete in OF section
Drilling and grouting of the existing old dam
Anchoring of buttresses with the old dam
Construction of 72m long Submersible Bridge on the Tansa River on d/s of dam
Cat Walk Steel Bridge 2m wide and 620 long on the OF section
Lighting arrangement on the top of dam
Epoxy plaster in the intake well
Replacement of emergency sluice valve and 72m long 2400mm diameter pipe
Improvement to the Atgaon-Tansa road: 13 Km length by 6mm seal coat over 50mm thick premix bitumen concrete for 3.75m width

Main duties performed in this project are listed below

Preparation and submission of program to client in the form of bar charts, considering the available resources and constraints, before starting the project
Finalization of item rates for subcontractors consulting with HO
To allot the works to different persons location wise
Supervision, leadership and co-ordination with own staff
Periodical review meetings to review the progress of work
Co-ordination with consultants, designer and client
Daily site visits to see the progress of work and if there is any difficulty, then to give the solution for that
Periodical checking for quality control tests
To review safety requirements and to give direction to the safety officer
Reconciliation of material on monthly basis and take necessary steps for shortfall/wastage of material

January / 2002 - November / 2005

HSA Aurangabad, Pune/ Maharashtra 




Project Manager Construction of Andra Valley Dam Project, including Foundation and Inspection galleries, Sump well, Irrigation cum Power outlet, Ogee shaped un gated crest, Lift well, Energy dissipation arrangement (EDA), End weir etc. Mangrul, Pune, Maharashtra.

On upstream (u/s) there was 5m wide colgrout masonry and on d/s random rubble masonry in1:5 mortars. D/s of OF was covered with 1.6m wide M 25 grade concrete. Masonry and concrete were bonded by providing anchor bars partially in masonry and remaining in concrete.


Main duties performed in this project are listed below

To prepare material requirement requisition for total project and to submit to HO
To prepare fund requisition for total project and to submit to HO
To prepare month wise labour requirement for complete project and to submit to HO
Supervision, leadership and co-ordination with own staff
Periodical review meetings to review the progress of work
Control of project cost wise
Co-ordination with consultants, designer and client
To give suggestions for the betterment of the project to client and also submission of the report of financial implication due to the changes suggested
To do daily correspondence with the client and HO, and to maintain the records of these correspondence
Daily site visits to see the progress of work and if there is any difficulty, then to give the solution for that
Periodical checking for quality control tests
Periodical meetings with subcontractors to know their difficulties and try to give the solutions
Review for material requirement for daily use with store manager

January / 1998 - December / 2001

HSA Aurangabad, Akola/Maharashtra 




Site Engineer Construction of Wan River Dam Project, including Foundation gallery, Inspection galleries, Sump well, Power outlet, Canal outlet, Energy dissipation arrangement (EDA), End weir etc. Wari, Akola Maharashtra, Government of Maharashtra.

Planning, Supervision, Scheduling, co-ordination, record keeping, making oral presentation to project manager, colleagues, supervisors on daily basis were the main duties which I had performed in this project very efficiently.

March / 1997 - December / 1997